A worker from Arizon Building Systems inspects the Hodag Dome while the Hodag watches. While looking for tiny leaks and patching them last week, the worker could also move the cables into their final position. After that, the LED lighting system was installed on the inside of the structure. The netting system, which will allow for simultaneous varied use of the dome, was installed this week.
Comments:
You must login to comment.